Home > Turnkey Project

Turnkey Project

A complete range of product equipment backed by strong in-house engineering enables turnkey supply of complete intake and exhaust systems for all types of Gas Turbines.

  •   Mechanical and thermal FEA assures optimal selection
  •   In-house 3D design modeling
  •   Gas turbine sizes from Fr.5 to Fr. 9 & V94.2; Stack height = 55 m,
  •   Turbine sizes from Fr.5 to Fr. 9 & V94.2; Stack height = 55 m,

 

Complete By-Pass System References include:
1996 NTPC4 off, V94.2 Siemens
1998 Kondapalli, Hanjung2 off, Frame-9E GE
1999 NAOC Nigeria, GE4 off,LM-2500
2000 Hazira, Alstom Power2 off, GT KA8C2
2002 Salalah, Oman, L&T6 off, GE Frame-6
2003 Salalah, Oman, L&T1 off, LM-2500
2005 Konaseema, L&T2 off, V94.2 Siemens
2007 Essar Power, BHEL2 off, Frame-9E Exh. Ducting
2009 IOCL Panipat, L&T5 off, Frame-6,
2011 MRPL, BHEL1 Off,
2012 DAHEJ RIL, BHEL1 Off

 

P1070544

WORLD’S EVER BIGGEST DAMPER SUPPLIED TO L&T MHI

 

Bachmann has proven ability for turnkey design/supply/erection solution for By-pass systems from GT Exhaust to HRSG Inlet. The unique capability to design and supply all components of the system from under one-roof, including  diverter, guillotine blank plate, expansion joints, ducting, stack, silencer and support work; has been demonstrated in systems ranging from those for small Frame-5 GTs to the largest Frame-9FA GTs.